click to zoom in

Atm Fuse Bypass Switch, Long Lead BX88272

(No reviews yet) Write a Review
Atm Fuse Bypass Switch, Long Lead BX88272

Atm Fuse Bypass Switch, Long Lead BX88272

$67.10

Why Buy Leonard?

Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch. The Fuse Bypass Switches are available in four different models. See application guide for fit information. This switch provides a safe alternative to the constant removal and re-installation of the fuse when changing from the towed mode to the driving mode.

  • Disconnect Your Fuse With The Flip Of A Switch
  • Safe Alternate To Constant Removal/Reinstallation Of Fuse
SKU:
FDRW-BX88272
allowed_types:
accessories